Geographische Lage / geographical location: Hier klicken / click here

2022

– PAULA water filtration plant is functioning poorly over time: battery life has expired, membranes are difficult to clean from fine sediment particles of lake water, etc.
– Cleaning of an existing borehole in the village
– Installation of PAULA solar panels on a steel frame at the borehole
– Relocation of the external water tanks from the container to a pedestal in the center of the village
– Installation of the groundwater pump and connection to the water tanks
– Construction of a water extraction point next to the tanks
– Handover of the ready-to-operate plant to the village of Sukuro on February 13, 2023

2017-2021

– Supervision of the water filtration plant in Sukuro.
– Minor repairs of the plant
– Accompaniment and supervision of the water committee of the village in the operation of the plant

2016

– Shipment of PAULA container with all accessories to Tanzania: solar panels, batteries, water tanks with filter membranes for filtration of sea water, water tank for filtered drinking water, pumps, pipes etc.
– Transport to and installation of the container in Sukuro
– Installation of water pump in the lake and pipe connection to the container
– Installation of water tanks for the filtered water outside the container with connection to the water intake point
– Handover of the ready-to-use system to Sukuro village on February 9, 2017.